Thomas and Cross Streets Improvements

When a neighborhood outgrows it’s streets and is also likened to an ice skating rink in the winter, it’s time for some upgrades. And the Village of Poynette did just that.

GEC addressed multiple issues by redesigning both streets to be wider, accommodating for on-street parking. Outdated sanitary and water pipes were replaced. Curb and gutter was installed to channel and control stormwater. Storm sewer and inlets were also installed to alleviate ponding stormwater. Two retaining walls were installed-one bolder wall and one keystone block wall.

 