Skip Navigation
rec-dot

Onalaska Bridge Updates

Cost effective municipal bridge replacements with minimal road closures for residents is the definition of win-win.

The Town of Onalaska had several bridges that were in need of replacement. GEC worked closely with Town officials to offer cost-effective solutions to the Town’s situation. Two of the bridges were replaced with built-on-site aluminum culverts. Another utilized culvert end sections to increase stream flow and the fourth was reinforced with new structural beams. Guard rails were installed on all new bridges.

Services Provided:

Structural Engineering

Stormwater Management & Erosion Control

Project Location:
Onalaska, WI