Onalaska Bridge Updates
Cost effective municipal bridge replacements with minimal road closures for residents is the definition of win-win.
The Town of Onalaska had several bridges that were in need of replacement. GEC worked closely with Town officials to offer cost-effective solutions to the Town’s situation. Two of the bridges were replaced with built-on-site aluminum culverts. Another utilized culvert end sections to increase stream flow and the fourth was reinforced with new structural beams. Guard rails were installed on all new bridges.